SERVING THE SOUTHEAST FOR NEARLY 30 YEARS

We're on call 24/7

1.423.892.8335

Operating Hours

Mon - Fri 8a.m. - 5p.m.

Email Us

universalserviceinc@comcast.net

Aeration Tank Cleaning

Municipal WWTP requested to remove sediment, sludge, and grit from aeration tank without damaging aeration system on floor.  USI safely removed material and hauled to local approved landfill

Before

After

Pipe Cleaning

Manufacturing company requested to clean a plugged approx. three foot diameter pipe.  USI utilized a Jetstream 40k unit to clean pipe.

Before

After

WWTP Cleaning

WWTP requested to remove dried sand and grit from concrete tank.  Material was safetly removed and hauled to local landfill for disposal

Before

In Progress

Pond Pumping

City Water Treatment Plant requested to pump backwash pond and  land apply in a approved field nearby. Over 1 million gallons were pumped and hauled successfully.

Before

After

Digester Cleaning

WWTP requested to clean multiple digesters.  USI pumped and belt pressed over 2 million gallons of bio-solids and hauled over 1,000 tons of bio-solid cake to the local landfill.

Before

After

Dust Removal

Textile company requested to clean dust accumulated within large HVAC system.  USI removed material with a wet ring setup and a vacuum truck.

Before

After

Ballast Removal

Customer needed river rock removed in order to replace surface membrane. USI utilized an industrial vacuum truck to remove the ballast.

Before

After